Mizen Group – Phase 1 – Plot 15 – 1no 6 Panel + 1no 3 Panel (both with side windows)
October 12 @ 9:00 am - 5:00 pm
SGG driver to meet you on site at 9am (Dave – 07983071843)
Must take method statement with you (See Ben to print it off)
No couplers – windows are to be fixed through the frames into the bifold
Please make sure you get installation paperwork signed off.